How drainfield area is calculated
Absorption area (sq ft) = design flow (gal/day) ÷ soil loading rate (gal/sq ft/day)
| Perc rate | Loading rate |
|---|---|
| 0–6 min/in | 1.2 gal/sq ft/day |
| 6–16 min/in | 0.8 gal/sq ft/day |
| 16–31 min/in | 0.5 gal/sq ft/day |
| 31–46 min/in | 0.4 gal/sq ft/day |
| 46–60 min/in | 0.3 gal/sq ft/day |
| Over 60 min/in | Not suitable for a conventional drainfield |
Worked example
A 3-bedroom home (360 gal/day) on soil that percs at 15 min/in loads at 0.8 gal/sq ft/day, so it needs about 450 sq ft of absorption area.
These are typical loading rates. Your state code and the soil evaluation set the actual design; slow soils may need a mound or other engineered system.
Questions
How big should a drainfield be?
Divide the design flow by the soil loading rate from the perc test. A 3-bedroom home on average soil often needs 400–700 sq ft of absorption area.
What perc rate is too slow for a drainfield?
Slower than about 60 minutes per inch is usually unsuitable for a conventional drainfield.